Pack Power AI
We acquire energized data centre facilities and retrofit them into AI-ready compute.
Pack Power AI acquires existing data centre facilities with scarce, energized infrastructure — and retrofits them into AI-ready compute. Faster than new-build. Cheaper than greenfield. Available now.
Willington Park, Burnaby BC — a 46,745 sq ft energized facility on a path to 5× expansion via BC Hydro.
Power upgrade path · BC Hydro
Upgrade path coordinated with BC Hydro · 3×+ capacity expansion within the existing footprint, no new entitlement risk.
Willington Park isn't waiting for the compute transition. The station is already operating — generating income, housing our engineering team, and serving as PACK's live innovation hub.
Shared-workspace tenant anchoring the upper floors with predictable, long-term occupancy.
Mixed-use office tenancy bridging the legacy-tenant transition through mid-2027.
Home base for the PACK engineering team — architecture, mechanical, electrical, and software — embedded on-site.
Triple-net lease income stabilized through the transition. The asset pays for itself while it evolves.
A live testbed for the Pack Power AI retrofit stack — cooling, power, and software — proven here before it ships.
| Dimension | Greenfield data centre | Pack Power AI retrofit |
|---|---|---|
| Time to power | 3–5 years | Months |
| Power availability | Queue | Energized |
| Capital intensity | Full build | Incremental |
| Risk profile | Entitlement + construction | Execution only |
From acquisition to stabilized AI compute, sequenced for cash flow and capital efficiency.
Acquire the 46,745 sq ft Willington Park facility — energized, NNN, with a known transition path.
Continue stabilized NNN income from the existing datacenter client, through 2027–2028.
Coordinate the 2 MW → 10 MW power upgrade in stages, leveraging the existing service.
Deliver the retrofitted facility to AI compute tenants, with cooling and density built for current silicon.
Deploy modular compute shells onto adjacent capacity — the playbook becomes a portfolio.
For LPs, hyperscalers, and infrastructure operators interested in the retrofit thesis or the Willington Park asset specifically.
Request the brief →